EXAPUNKS
REACTOR 1: MONITOR (NUCLEAR PLANT A235X)
rocketdrive 2018 年 12 月 15 日 下午 11:49
How did anyone beat itteration 66?
The rods physicaly cannot be lowered fast enough before the system blows. I've already tried a whistle blower team that on EVERY cycle tests the value to make for the fastest response time through the M cache. Even THAT cant lower it fast enough. 50 units (inputed by writing 100) simply is too slow. Every other iteration works UNTIL I hit 66.
最后由 rocketdrive 编辑于; 2018 年 12 月 15 日 下午 11:50
< >
正在显示第 1 - 2 条,共 2 条留言
ekimekim  [开发者] 2019 年 5 月 29 日 下午 6:14 
I let the RNG decide the test parameters, and my solution worked but it was definitely harder than intended. I might try to go tweak the settings to fix that, since this part wasn't meant to be so hard.
landvaarder 2019 年 10 月 10 日 下午 1:23 
if you still have problems, i solved it with the aforementioned whistle blower that when it went off sent an M message and turned the pump to full.
the control rod i had it sync with void M and @rep 20 copy 100 to control.
< >
正在显示第 1 - 2 条,共 2 条留言
每页显示数: 1530 50