EXAPUNKS
REACTOR 1: MONITOR (NUCLEAR PLANT A235X)
How did anyone beat itteration 66?
The rods physicaly cannot be lowered fast enough before the system blows. I've already tried a whistle blower team that on EVERY cycle tests the value to make for the fastest response time through the M cache. Even THAT cant lower it fast enough. 50 units (inputed by writing 100) simply is too slow. Every other iteration works UNTIL I hit 66.
Τελευταία επεξεργασία από rocketdrive; 15 Δεκ 2018, 23:50
< >
Εμφάνιση 1-2 από 2 σχόλια
ekimekim  [δημιουργός] 29 Μαϊ 2019, 18:14 
I let the RNG decide the test parameters, and my solution worked but it was definitely harder than intended. I might try to go tweak the settings to fix that, since this part wasn't meant to be so hard.
if you still have problems, i solved it with the aforementioned whistle blower that when it went off sent an M message and turned the pump to full.
the control rod i had it sync with void M and @rep 20 copy 100 to control.
< >
Εμφάνιση 1-2 από 2 σχόλια
Ανά σελίδα: 1530 50