安装 Steam
登录
|
语言
繁體中文(繁体中文)
日本語(日语)
한국어(韩语)
ไทย(泰语)
български(保加利亚语)
Čeština(捷克语)
Dansk(丹麦语)
Deutsch(德语)
English(英语)
Español-España(西班牙语 - 西班牙)
Español - Latinoamérica(西班牙语 - 拉丁美洲)
Ελληνικά(希腊语)
Français(法语)
Italiano(意大利语)
Bahasa Indonesia(印度尼西亚语)
Magyar(匈牙利语)
Nederlands(荷兰语)
Norsk(挪威语)
Polski(波兰语)
Português(葡萄牙语 - 葡萄牙)
Português-Brasil(葡萄牙语 - 巴西)
Română(罗马尼亚语)
Русский(俄语)
Suomi(芬兰语)
Svenska(瑞典语)
Türkçe(土耳其语)
Tiếng Việt(越南语)
Українська(乌克兰语)
报告翻译问题






without loss of appearance
you have to use move it to get them at the right height and position. its a prop that needs to be placed in water.
Yes, I can do it ) in the near future will do this
Hopefully you take this as a constructive suggestion, but would removing the bridge deck and railing reduce the triangle etc count, at least slightly? While some will appreciate the deck being there, some may want flexibility to use this for highways or roads of different widths, etc. Maybe you could release an alternate version (assuming simply removing the deck is the small amount of work I imagine it - it may very well not be).
Again, great asset.
no need to worry ) there are good assets, where there are more triangles to take only "WTC" from "BoldlyBuilding " one of the best assets that has about 150 000 triangles . and all is well) so it's not the most important .
and optimization to see ? there are no forces! better than any other job ! 18 thousand triangles , it doesn't matter ! ( 24.50 1.17 ) mesh info diamond optimization . I personally explained to you that the span of the bridge(single) made for comfort and versatility ! divide so that everything was easy with flexible installation options and use! thank
Move it are enough for me to use your awesome bridge
do you know another tool ? You can lift or move an object to another location ) is not just for "prop"
\/ \/ \/ \/