Train Simulator Classic

Train Simulator Classic

Peninsula Corridor: San Francisco / Fremont - San Jose - Gilroy - Salinas [Final]
Mostrando 1-10 de 24 aportaciones
< 1  2  3 >
Actualización: 30 SEP 2024 a las 1:59

Route made final.

Scenarios should now show up for everyone.

This brings the end to the updating route in it's current form as I am working on other projects,.

Many Thanks.

Actualización: 17 AGO 2024 a las 11:07

Scaled back on the expansion of the route - due to working on my other project (Pacific Surfliner) which I am spending more time on currently.

This update includes minor track speed updates, signalling updates and some scenery additions in various locations.

Actualización: 20 FEB 2024 a las 2:47

Updated Items...
- Route Marker Updates - reduced the scope of route expansion again.
- Salinas is now the southern finishing point of the route.
- Salinas industry tracks updated.
- Scenery updates between Fremont station and Niles junction.

New Items...
- More scenery on the Coast Subdivision at the northern end of the route.

Actualización: 5 DIC 2023 a las 6:36

Updated Items...
- QD Scenario updates.
- Main track scenery finished in Salinas - started work on industry tracks.
- Minor track speed and signal updates.
- Scenery updates between Fremont station and Niles junction diamond crossing.

New Items...
- Terrain, tracks (no markers/signals) and some scenery added in the Oakland Jack London Square area.
- More track and scenery on the Coast Subdivision at the northern end of the route.
- Commenced laying tracks south from Oakland.

Actualización: 19 JUL 2023 a las 8:00

- Scenery updates

Actualización: 12 JUL 2023 a las 3:41

- Removed the Pacific Surfliner dependency and scenario.

- Updated the scenarios that have the tracks.bin error message on loading

- Scenery updates.

Actualización: 10 JUL 2023 a las 14:35

Updated Items - 10 July 2023

- Scenario updates - some scenarios are still works in progress but are included anyway.
- Track speed and signal updates between Tamien and Gilroy.
- Track and signalling updates in Watsonville.
- Track, signalling and scenery updates in Salinas.

New Items..
- Additional scenarios built for the route.
- Track and some scenery added north from Fremont station to the Niles junction diamond crossing.
- Additional track and scenery laid southwards on the UP Coast Sub from Salinas.

Current additional dependencies for the route (for scenarios)..
- Los Angeles Commuter Rail F59PH Loco add-On.
- Miami - West Palm Beach route add-on.
- Amtrak Dash 8-32BWH Loco add-on.
- Pacific Surfliner route add-on.


Coming in the next update..
- More track and scenery at the northern end of the route.
- Scenery gap filling in the new areas.



IN THE SIM EXTRAS ALSO IN PROGRESS:-

- Additional buildings, trees, etc in various areas.

Actualización: 19 MAR 2023 a las 17:31

Updated Items..
- Minor track speed and signal updates around San Jose and Santa Clara.
- Scenery finally added around Fremont.
- Scenario updates to include the 'Metrolink' cars now running in some Caltrain trains.

New Items..
- Sounds added to new sections of route.
- Additional tracks and scenery laid in various locations.


Coming in the next update..
- Track and some scenery will be added north from Fremont station to the Niles junction diamond crossings. Other areas will have scenery added as required.

Actualización: 5 FEB 2023 a las 12:10

Version 1.1.0

Version 1.1.0 of the expanded "Peninsula Corridor" route sees track and scenery updates in various areas.

Updated Items..
- Industry sidings and scenery south of Fremont (work in progress).
- Industry sidings, freight yards and scenery in the Newark area (work in progress).
- Newark Industrial Lead (abandonded Dumbarton branch) work in progress.
- Minor track speed and signal updates on the Niles sub around CP Cherry.

New Items..
- Over 3 miles of track and some scenery added north from CP Carter (Coast Sub MP30.6) and CP Cherry (Niles Sub MP 34.5) towards Fremont station and beyond.
- Fremont station added to the route - surrounding scenery is not yet complete.
- Work started on the Fremont diamond crossing where various UP Subdivisions all merge together.

Actualización: 29 OCT 2022 a las 4:07

Updated Items..
- Industry sidings and scenery south of Fremont (work in progress).
- Industry sidings, freight yards and scenery in the Newark area (work in progress).
- Newark Industrial Lead (abandoned Dumbarton branch) work in progress.


Next update to come will add more track miles to the route.