Train Simulator Classic

Train Simulator Classic

100 个评价
Yard Work (Altoona) Part 5
   
奖励
收藏
已收藏
取消收藏
文件大小
发表于
273.839 KB
2018 年 4 月 30 日 下午 6:34
1 项改动说明 ( 查看 )

订阅以下载
Yard Work (Altoona) Part 5

在 RBJets 的 1 个合集中
Horseshoe Curve Series
20 件物品
描述
(Scenario #19 in series) Loading is now done at the Freight Transfer Yard and after you drop that stock you will need to run some wagons over to the Car Shop Sidings in need of service.

Loco: EMD GP7 Pennsy - Difficulty: Easy - Length: 35 Mins

Click on above "Horseshoe Curve Series" collection link for scenario list/order.
18 条留言
RBJets  [作者] 2024 年 6 月 5 日 下午 7:48 
Just making sure you didn't miss anything. :)
robmerlo 2024 年 6 月 5 日 下午 7:34 
Sorry my friend must have jumped this one yes i have done it and successfully thank you
RBJets  [作者] 2018 年 5 月 28 日 上午 11:54 
Welcome and thanks Rammy one more to go. :)
Rammy 2018 年 5 月 27 日 上午 11:44 
That was a Very Good Tour round a Huge Yard. Thank You.
RBJets  [作者] 2018 年 5 月 21 日 上午 3:52 
Thanks again Warren, enjoy the last part. :)
wadawes 2018 年 5 月 21 日 上午 3:41 
Many thanks RB, great as usual. Altoona is a huge yard and you are giving us a look at lots of it.
Cheers, Warren
RBJets  [作者] 2018 年 5 月 6 日 下午 1:48 
Thanks Chris. I try to go you all from point to point as easy as possible but a little challenge is good I think. :)
chris5012 2018 年 5 月 6 日 下午 1:43 
Excellent scenario again RB. Very challenging working out the routing through the complex junctions but very satisfying when it all works out!!
RBJets  [作者] 2018 年 5 月 3 日 下午 4:29 
Posting tonight.......
Robbie 2018 年 5 月 3 日 下午 3:13 
How is Donner pass is coming on