安装 Steam						
					
				
				
									登录
											 | 
						语言
						
																																															繁體中文(繁体中文)
																													日本語(日语)
																													한국어(韩语)
																													ไทย(泰语)
																													български(保加利亚语)
																													Čeština(捷克语)
																													Dansk(丹麦语)
																													Deutsch(德语)
																													English(英语)
																													Español-España(西班牙语 - 西班牙)
																													Español - Latinoamérica(西班牙语 - 拉丁美洲)
																													Ελληνικά(希腊语)
																													Français(法语)
																													Italiano(意大利语)
																													Bahasa Indonesia(印度尼西亚语)
																													Magyar(匈牙利语)
																													Nederlands(荷兰语)
																													Norsk(挪威语)
																													Polski(波兰语)
																													Português(葡萄牙语 - 葡萄牙)
																													Português-Brasil(葡萄牙语 - 巴西)
																													Română(罗马尼亚语)
																													Русский(俄语)
																													Suomi(芬兰语)
																													Svenska(瑞典语)
																													Türkçe(土耳其语)
																													Tiếng Việt(越南语)
																													Українська(乌克兰语)
																									报告翻译问题
							
						
 
											 
													

 6
 6								 
					




 举报此帖
 举报此帖


Signal changes and some minor repairs have taken place.
New quickdrive scenarios between Caboolcha South and Bracalba
Update 19/08/18
Base scenery extended from Bracalba to top of range(Raaens rd).
Update 26/08/18
Scenery around D'Aguilar in progress.
New Quickdrive scenario between Caboolcha South and D'Aguilar.
Small siding added at Wamuran,also telegraph poles added along the rail corridor.
Update 7/10/18
Scenery between D'Aguilar and Woodford is well underway.
Woodford is under heavy construction.
New Quickdrives between Caboolcha South and Woodford
Update 14/10/18
Scenery near complete to Woodford.
Track work for Frieght Yard and Depot at Woodford complete.
Scenery around Woodford still in progress.
Update 21/10/18
Scenery at Woodford nearly complete.
Western outskirts of Woodford in progress
Update 28/10/18
Signals plus points rods and cables introduced from the Wherry Line route.
Also some misc objects used.
Signalling is complete to Woodford,but some signals still needing some fine tuning.
Update 05/04/19
Route is near completion,with just a few minor details to add and adjust the route should be made final in the coming weeks.
The route has now been made final,hope everyone enjoys the route,and feel free to make scenarios for it.