This is my most perfect and compressed layout for a factory which can process all types of input into Bars, automatically selling Dirt, and seperating Coal and Tailings.
My goal is not to be as efficient or as cheap as possible, i want to build as compact and as small as possible while still being able to process all types of material.
Here's how small i got so far. I managed to get it down to 15 x 9 grid (plus 2 tiles extra which i unfortunately couldn't get onto the rectangle.
If you want to try yourself - this are the steps to go:
   
奖励
收藏
已收藏
取消收藏
Goal:
Our goal is to create a full functional plant, which processes 100% of all input types using the smallest possible area.
It is forbidden to build massively into the height.
Also it is forbidden to have massive clippings (meaning placing objects like storage, waterplant, smelters etc in a way they look placed inside each other. We can't avoid clippings at all to build so small, but at least try to keep it minimal.
Also let's say that all buildings should have "logical structural stability" - meaning that it's forbidden to build conveyors over a huge distance without ground support. Also it's forbidden to place Smelters hanging in the air.... - you get the gist i guess.
How to build it Step by Step - Prepare the area
Ok - let's have fun:
First we need to prepare the area we want to build on.
I recommend to nuke a hole for the Big Hopper first, and place a rectangle 15 x 9 tiles.
It should look like this:
(Note: the 3 appending tiles are needed - the single one to attach the elevator, the double one will be used by parts of the last storage.

Then we want to place the 4 Big Hoppers, The 10x Speed Power Input, and the 2 Left turns at the outer end. Also we have to connect it to our main elevator.
Like this:

IMPORTANT:
Attach the Power Input to the pylon on the other side of the elevators (if you put all power to the same grid, it will explode (overpower). You need to do 2 different grids exactly as i did on the screenshots!

If you close the surface with Concrete Blocks, use Concrete Floor Tiles in front of the Elevator to avoid massive clippings:

After placing the 2 Elevators and the 4 WInd Turbines (each 2 Turbines per Power Grid) it should look like this:
That's all we need to be ready to start.
Main line (stone path)
Let's build the main line (stone path) first:
Place Jaw Crusher, Shaker Screen, Coal Screen, Cone Crusher and Froth Floater - exactly in that order from top elevator down to ground.
It should now look like this:

That been done, we install the water pump for the Froth Floater:

And so our first part is already done.
Coal Seperation
Now we build our part for the seperated coal - see screenshot:
Put the Power Cable to the other grid (not the one we put the main power input (Hopper) on.
Tailings Handling
Once we are done with the coal path, we take care of our tailings after Froth Floater:
Use the second power grid!
Dirt/Paydirt/Ore Path
Time to build a way to get our dirt and paydirt processed:
We first build some "weird" conveyor construct. This is necessary to get our Paydirt-Ore line as near as possible to our already existing "stone path" to save valuable space:
Attach power cable to the first power gid!

That been done, we can now place the Washplant and the Trommel. Don't forget the 2m piece between them, or the selling point will not match later:

Also our Washplant will get some water (not really necessary, but we have the space to fit it in):

If you did it right, there is now room where the Sellpoint matches perfectly underneath the Washplant, so that the Trommel drops the remaining Dirt automatically in there for auto-selling:

To make it look more realistic (structural integrity), you also can build a wall right underneath the Screen line:
Merging The Ores
At this point, we have 2 "ore lines". One from the Floather and another one from the Trommel.
To merge them without dropping directly on a conveyor or even use a Merger Conveyor, we have to use some "workarounds" (still within the "rules").
Don't worry - these concrete blocks do not hang in the air, they are supported from a column right behind them - you may see that on another screenshot angle:
(We use the second power grid for the Power Input)
High Temp Smelter and Smelter
This is quite straight forward.
Place them in that order to the conveyor like this:
(NOTE: if you want to produce Iron Bars instead of Steel Bars for whatever reason, simply swap them and place them in the other order)
Bar Roller and Storage
We are nearly done!
We only need to place some conveyor belts, the Bar Roller and the last Storage.
Do not forget to put a 2m conveyor after the Bar Roller, or else there's a massive clipping to the Screener above!
It should now look like this:
Final View
DONE!
We squeezed the whole plant into a nearly 15 x 9 grid.
I hope you liked this guide - if yes, please leave a thumbs up XD
This is what it looks like overall from different angles after been finished:
Full Material List
And finally here is the full list of all items you have seen in this guide, including the Concrete Foundation, the Drop Zone Hopper and the whole Power Grid:

ChatGPT:
Item
Amount
Price each (unskilled)
Total (unskilled)
Price each (skilled)
Total (skilled)
Bar Roller
1
$ 10.000
$ 10.000
$ 9.650
$ 9.650
Big Hopper
4
$ 4.500
$ 18.000
$ 4.343
$ 17.372
Coal Screen
1
$ 5.700
$ 5.700
$ 7.238
$ 7.238
Concrete Block
274
$ 2.400
$ 657.600
$ 2.316
$ 634.584
Concrete Floor
2
$ 1.400
$ 2.800
$ 1.351
$ 2.702
Cone Crusher
1
$ 55.000
$ 55.000
$ 53.075
$ 53.075
Down 4x4
1
$ 4.500
$ 4.500
$ 4.343
$ 4.343
Dump Deck
32
$ 2.500
$ 80.000
$ 2.413
$ 77.216
Elevator 8m
3
$ 4.500
$ 13.500
$ 4.343
$ 13.029
Froth Floater
1
$ 7.500
$ 7.500
$ 7.238
$ 7.238
High Temp Smelter
1
$ 10.000
$ 10.000
$ 9.650
$ 9.650
Hopper
5
$ 4.500
$ 22.500
$ 4.343
$ 21.715
Jaw Crusher
1
$ 45.000
$ 45.000
$ 43.425
$ 43.425
Left 2x
4
$ 4.500
$ 18.000
$ 4.343
$ 17.372
Pipe Left 2m
2
$ 4.500
$ 9.000
$ 4.343
$ 8.686
Pipe Right 2m
2
$ 4.500
$ 9.000
$ 4.343
$ 8.686
Pipe Up 4x4
2
$ 4.500
$ 9.000
$ 4.343
$ 8.686
Power Cable
14
$ 10
$ 140
$ 10
$ 140
Power Input 10x Speed
6
$ 125.000
$ 750.000
$ 120.625
$ 723.750
Power Pylon 5400
6
$ 12.000
$ 72.000
$ 11.580
$ 69.480
Right 2x
4
$ 4.500
$ 18.000
$ 4.343
$ 17.372
Sellpoint
1
$ 13.000
$ 13.000
$ 12.545
$ 12.545
Shaker Screen
1
$ 7.500
$ 7.500
$ 7.238
$ 7.238
Smelter
1
$ 10.000
$ 10.000
$ 7.650
$ 7.650
Storage
3
$ 6.500
$ 19.500
$ 6.273
$ 18.819
Straight 2m
3
$ 1.500
$ 4.500
$ 1.448
$ 4.344
Straight 4m
1
$ 2.500
$ 2.500
$ 2.413
$ 2.413
Trommel
1
$ 7.500
$ 7.500
$ 7.238
$ 7.238
Up 4x4
2
$ 4.500
$ 9.000
$ 4.343
$ 8.686
Washplant
1
$ 7.500
$ 7.500
$ 7.238
$ 7.238
Water Pump
2
$ 1.500
$ 3.000
$ 1.448
$ 2.896
Wind Turbine 1800W
4
$ 113.400
$ 453.600
$ 109.431
$ 437.724
Total (unskilled):
$ 2.354.840
Total (skilled):
$ 2.272.200