工人与资源:苏维埃共和国 Workers & Resources: Soviet Republic

工人与资源:苏维埃共和国 Workers & Resources: Soviet Republic

54 个评价
Engineering and Laboratory Building of ENIMS
   
奖励
收藏
已收藏
取消收藏
Building
Buildings (by category): Factory, Industrial facility
文件大小
发表于
更新日期
25.895 MB
10 月 19 日 下午 1:02
10 月 19 日 下午 2:36
6 项改动说明 ( 查看 )

订阅以下载
Engineering and Laboratory Building of ENIMS

描述
The engineering and laboratory building of the Scientific Research Experimental Institute of Metal-Cutting Machine Tools (ENIMS) in Moscow was presumably begun in 1986 as part of the institute’s expansion and modernization program.
Construction dragged on and was completed only by 1993, likely with significant deviations from the original design. The left and right wings of the building differ noticeably in structure, and the absence of the top floor on the right side suggests that the final stage of construction used existing frameworks and materials rather than following the initial blueprints.

After 1993, the building was privatized. Instead of resuming research activity, it was soon leased out and gradually transformed into the “Clever” business center.
Today, the building’s interior—except for the sanitary and elevator-staircase cores—is a completely new structure, preserving only the exterior shape and basic layout of the original design.

Very little information about this complex can be found in open sources, yet architecturally it remains an interesting example of late-Soviet functionalism and engineering brutalism.

In the game, the building appears as a mechanical parts factory.

Workforce: 300
Maximum daily output: 111 t of mechanical parts
Resource consumption at full capacity: 123 t of steel

Open storage: 350 t of steel
Export storage: 200 t of mechanical parts
6 条留言
Alf 35 分钟以前 
Extremely beautiful building. Could we get a technical university version?
Tweek Tweak 10 月 24 日 上午 5:24 
modernist master plearice
grom113 10 月 21 日 下午 12:38 
Хорошая работа товарищ!
Ждем новых интересных проектов....
=)

ЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖЖ

Good job comrade!
We are waiting for new interesting projects....
=)
Polkovnik Berezin 10 月 20 日 上午 6:07 
Looks very good, great work! I think I will probably change the building to be a technical university, rather than manufacturing plant, on my end.
nebestetic  [作者] 10 月 19 日 下午 2:38 
It was Stalinium, not regular steel
Thanks for noticing, it's now fixed
virgilio.dias 10 月 19 日 下午 2:19 
It consumes 24t of steel to produce 600t of mechanical parts?