工人与资源:苏维埃共和国 Workers & Resources: Soviet Republic

工人与资源:苏维埃共和国 Workers & Resources: Soviet Republic

73 个评价
Almaraz nuclear power plant
2
   
奖励
收藏
已收藏
取消收藏
Building
Buildings (by category): Industrial facility
文件大小
发表于
更新日期
65.203 MB
2023 年 9 月 8 日 上午 7:46
8 月 9 日 上午 7:58
9 项改动说明 ( 查看 )

订阅以下载
Almaraz nuclear power plant

描述
The Almaraz nuclear power plant is a nuclear power plant located in the municipality of Almaraz (province of Caceres), it was the first second generation nuclear power plant built in Spain and belongs to the companies Iberdrola, Naturgy and Endesa that form the Centrales Nucleares Almaraz-Trillo society (CNAT), generates more than 6% of Spanish energy.

It has two 2947 MWth PWR reactors, Unit I entered commercial service on May 1, 1981 and Unit II did so on October 8, 1983. Its cooling system is open circuit to the Arrocampo reservoir on the Tagus River.

Workers needed 100
Profesors needed 40
Maximum electrical production 12000Mwh
Road access 1
Pedestrian access 8
Loading and unloading area 2
High voltage connection 14
Low voltage connection 4
Nuclear fuel store 4t
Nuclear waste store 4t
Outdoor nuclear fuel store 92m2
Outdoor nuclear waste store 92m2
Water connections 4
Water tank capacity 1200
Sewer connections 4
Sewer tank capacity 1200
Cooling connections 2
Nuclear fuel consumption 0.10t
water consumption 25 m3
Minimum water quality 65%
Factory connections 4

NUCLEAR POWER PLANT (10 phases)

Gravel 128.5
Asphalt 135
Concrete 815.3
Steel 526.5
Bricks 529
Prefab panels 118
Boards 40.5
Mechanical components 74.3
Electronic components 52.8
Workers 28720

COOLING TOWERS (2 phases)

Gravel 132
Asphalt 148
Concrete 211
Steel 92.1
Mechanical components 7.2
Electronic components 1.2
Workers 3319







La central nuclear de Almaraz es una central nuclear situada en el termino municipal de Almaraz (provincia de Caceres),fue la primera central nuclear de segunda generacion construida en España y pertenece a las empresas Iberdrola, Naturgy y Endesa que forman la Sociedad Centrales Nucleares Almaraz-Trillo (CNAT), genera mas del 6% de la energia española.

Tiene dos reactores PWR de 2947 MWth, la Unidad I entro en servicio comercial el 1 de mayo de 1981 y la II lo hizo el 8 de octubre de 1983, Su sistema de refrigeracion es de circuito abierto al embalse de Arrocampo en el rio Tajo.

Trabajadores necesarios 100
Trabajadores formados necesarios 40
Produccion electrica maxima 12000Mwh
Accesos por carretera 1
Accesos peatonales 8
Zonas de carga y descarga 2
Conexiones de alto voltaje 14
Conexiones de bajo voltaje 4
Almacen de combustible 4t
Almacen de residuos 4t
Almacen de combustible exterior 92m2
Almacen de residuos exterior 92m2
Conexiones de agua 4
Capacidad de depositos de agua 1200
Conexiones de alcantarillado 4
Capacidad de depositos de alcantarillado 1200
Conexiones de refrigeracion 2
Consumo de combustible nuclear 0.10t
Consumo de agua 25 m3
Calidad de agua minima 65%
Conexiones de fabrica 4

CENTRAL NUCLEAR (10 fases)

Grava 128.5
Asfalto 135
Hormigon 815.3
Acero 526.5
Ladrillos 529
Paneles prefabricados 118
Tablones 40.5
Componentes mecanicos 74.3
Componentes electronicos 52.8
Dias de trabajo 28720

TORRES DE REFRIGERACION (2 fases)

PREPARATORIOS

Grava 132
Asfalto 148
Hormigon 211
Acero 92.1
Componentes mecanicos 7.2
Componentes electronicos 1.2
Dias de trabajo 3319
18 条留言
Septimus 8 月 13 日 上午 10:55 
Hello,

Yes, I noticed the change in game after rebuilding them.

Thanks again for your efforts that improve our game experience and keeping such an open mind to external suggestions :cozybethesda: !

Best regards
gonzaldd  [作者] 8 月 9 日 上午 7:59 
Hello, I have increased the outdoor storage to 92 m2
Septimus 8 月 9 日 上午 4:59 
Hello,

Thanks for taking the time to consider my request and for increading the internal (rad protected) storage.

My suggestion was to increase the "open storage" space used to store the spent containers : according to the tooltip, the Almaraz plant only has 23 m2 of storage. The vanilla twin reactor plant, while beeing less powerfull, has 88 m2 of storage :

Almaraz tooltip : https://postimg.cc/XZw6cqLr
Vanilla plant tooltip : https://postimg.cc/JtYvXj8T

Would it be possible to increase the open storage in the Almaraz plant to at least match the vanilla one ?
When looking at the plant in-game it seems that there is a lot of empty space around the storage area and that it could be expanded without colliding with any building. However I have never moded this game so I have no idea if that is an easy change or not.

Regards
gonzaldd  [作者] 8 月 3 日 下午 2:17 
Hello and thank you. I've never had any problems with storage (I usually use trucks), and in fact, it has the same internal storage as the vanilla plant. However, because it's a powerful plant and therefore consumes fuel quite quickly, I've increased the internal storage to 4 tons.
Septimus 8 月 1 日 上午 5:27 
Hello,

Thank you for this beautiful work. I made this my main design in most of my games.

However I encountered the following issue : the powerplant can be easily saturated by spend fuel if the fuel is not frequently collected (in my case it is a train line with many stops so there can be delays). The plant itself can only store a few casks (less than 5 I think), and external storage available through connections is not used (the plant does not "push" the casks to the external storage and just stops operating).

As quick fix, could you increase the internal cask storage of the plant (or the rad protected storage) ?

Regards
gonzaldd  [作者] 2023 年 12 月 8 日 下午 1:58 
Hola, la verdad es que no se me habia ocurrido y es una buena idea, pero por ahora no, al manos a corto plazo, lo siento.
bacons960 2023 年 12 月 6 日 下午 8:22 
Hola de nuevo, disculpa la molestia pero quería preguntarte una cosa si estás pensando hace una fábrica de cemento en España.
gonzaldd  [作者] 2023 年 11 月 29 日 下午 3:19 
Curioso, hace cuatro dias construi por primera vez su equivalente en el juego y pense que estaria bien hacer una version pequeña de ella.

No obstante a nivel de centrales voy surtido, ahora mismo estoy con la central nuclear de Santa Maria de Garoña (esta acabada al 60-70% mas o menos), y aparte de mas centrales españolas (Vandellos II o Asco, por ejemplo, o la de carbon de As pontes que te comente antes) tambien ya me han pedido que haga alguna mas, como Loviisa, ademas me gustaria hacer tambien alguna de la era sovietica estilo Kursk o Smolensk, por lo que, unido a que son cosas complejas, que llevan tiempo para hacerlas en condiciones lo veo muy dificil que la haga.

No obstante lo pensare, pero ya te digo que las posibilidades son muy bajas y no prometo nada.
bacons960 2023 年 11 月 29 日 上午 8:06 
https://elnacional.com.do/wp-content/uploads/2023/02/WhatsApp-Image-2023-02-19-at-10.24.56-AM.jpeg?mrf-size=m este es una planta de residuos quema basura para convertirla en energía
Zizo 2023 年 10 月 13 日 上午 2:46 
Wou! so fast? Thanks a lot!! :)