工人与资源:苏维埃共和国 Workers & Resources: Soviet Republic

工人与资源:苏维埃共和国 Workers & Resources: Soviet Republic

52 个评价
Zorita nuclear power plant
   
奖励
收藏
已收藏
取消收藏
Building
Buildings (by category): Industrial facility
文件大小
发表于
更新日期
27.655 MB
2023 年 5 月 20 日 下午 1:31
8 月 10 日 上午 4:05
21 项改动说明 ( 查看 )

订阅以下载
Zorita nuclear power plant

描述
The Jose Cabrera nuclear power plant (also known as Zorita) was the first nuclear power plant built in Spain, located next to the Tagus river in the municipality of Almonacid de Zorita, in the province of Guadalajara. It belonged to Union Electrica Madrileña (now Naturgy). It owes its name to the engineer Jose Cabrera Felipe, one of the first promoters of the construction of nuclear power plants in Spain. Construction began on July 6, 1965 and was completed in March 1968, the official inauguration was on December 12, 1968 by the dictator Francisco Franco. It had a Westinghouse PWR reactor with a power of 160 MW, its cooling system was mixed through cooling towers and the Zorita reservoir, on the Tagus river, it was decoupled from the electrical network on April 30, 2006, currently It is in the process of being dismantled.

NUCLEAR POWER PLANT

Workers needed 16
Profesors needed 8
Maximum electrical production 1920Mw
Road access 1
Pedestrian access 5
Loading and unloading area 2
High voltage connection 5
Low voltage connection 2
Nuclear fuel store 1t
Nuclear waste store 1t
Outdoor nuclear fuel store 23m2
Outdoor nuclear waste store 23m2
Water connections 2
Water tank capacity 150
Sewer connections 1
Sewer tank capacity 150
Cooling connections 1
Nuclear fuel consumption 0.016t
water consumption 4.8 m3
minimum water quality 65%
Factory connections 4

GROUNDWORKS
Gravel 88.5
Asphalt 95
Concrete 125
Workers 1350

BRICKS LAYING

Concrete 205
Steel 78.5
Bricks 80
Prefab panels 24.5
Workers 2170

BRICKS LAYING 1.0

Concrete 85
Steel 28.5
Bricks 60
Prefab panels 25.8
Workers 1040

STEEL LAYING

Steel 56.5
Workers 440

INTERIORS

Boards 20.5
Steel 38.5
Mechanical components 14.3
Electronic components 12.8
Workers 782

COOLING TOWERS

GROUNDWORKS

Gravel 92
Asphalt 98
Concrete 85
Workers 920

STEEL LAYING

Steel 38.8
Mechanical components 6.7
Electronic components 0.8
Workers 782

STEEL LAYING

Concrete 68
Steel 30.5
workers 948






La central nuclear Jose Cabrera (mas conocida como Zorita) fue la primera central nuclear construida en España, situada junto al rio Tajo en el termino municipal de Almonacid de Zorita, en la provincia de Guadalajara. Pertenecio a Union Electrica Madrileña (ahora Naturgy). Debe su nombre al ingeniero Jose Cabrera Felipe, uno de los primeros promotores de la construccion de centrales nucleares en España, se comenzo a construir el 6 de julio de 1965 y se finalizo en marzo de 1968, la inauguracion oficial fue el 12 de diciembre de 1968 por el dictador Francisco Franco. Tenia un reactor PWR de Westinghouse con una potencia de 160 MW, su sistema de refrigeracion era mixto a traves de torres de refrigeracion y del embalse de Zorita, en el rio Tajo, se desacoplo de la red electrica el 30 de abril de 2006, actualmente esta en proceso de desmantelamiento.

Trabajadores necesarios 16
Trabajadores formados necesarios 8
Produccion electrica maxima 1920Mw
Accesos por carretera 1
Accesos peatonales 5
Zonas de carga y descarga 2
Conexiones de alto voltaje 5
Conexiones de bajo voltaje 2
Almacen de combustible 1t
Almacen de residuos 1t
Almacen de combustible exterior 23m2
Almacen de residuos exterior 23m2
Conexiones de agua 2
Capacidad de depositos de agua 150
Conexiones de alcantarillado 1
Capacidad de depositos de alcantarillado 150
Conexiones de refrigeracion 1
Consumo de combustible nuclear 0.016t
Consumo de agua 4.8 m3
Calidad de agua minima 65%
Conexiones de fabrica 4

CENTRAL NUCLEAR

PREPARATORIOS

Grava 88.5
Asfalto 95
Hormigon 125
Dias de trabajo 1350

TENDIDO DE LADRILLO

Hormigon 205
Acero 78.5
Ladrillos 80
Paneles prefabricados 24.5
Dias de trabajo 2170

TENDIDO DE LADRILLO

Hormigon 85
Acero 28.5
Ladrillos 60
Paneles prefabricados 25.8
Dias de trabajo 1040

TENDIDO DE ACERO

Acero 56.5
Dias de trabajo 440

INTERIORES

Tablones 20.5
Acero 38.5
Componentes mecanicos 14.3
Componentes electronicos 12.8
Dias de trabajo 782

TORRES DE REFRIGERACION

PREPARATORIOS

Grava 92
Asfalto 98
Hormigon 85
Dias de trabajo 920

TENDIDO DE ACERO

Acero 38.8
Componentes mecanicos 6.7
Componentes electronicos 0.8
Dias de trabajo 782

TENDIDO DE ACERO

Hormigon 68
Acero 30.5
Dias de trabajo 948
16 条留言
gonzaldd  [作者] 8 月 9 日 下午 4:29 
Fixed a faulty texture on a window, and I also took the opportunity to optimize it by reducing polygons.
「⊥| On The Level 🝪 7 月 29 日 下午 2:08 
RIP Zorita plant, today it's almost completely demolished
gonzaldd  [作者] 2024 年 6 月 25 日 上午 3:30 
The switchyard considered it, but finally discarded it, possibly in the future I will make one to place it as an addon for this or any central, Regarding the contamination of the towers, it is something inherent to the game and nothing can be done. If you want to eliminate the contamination, in building.ini, you can eliminate the values ​​that begin with $PARTICLE, at the cost of losing the animation of the steam coming out of the chimneys.
GreezyHammer 2024 年 6 月 24 日 下午 9:50 
Needs a full-sized switchyard and white water vapor coming off the steam condenser and then it's proper. I find that in this game, mysteriously, cooling towers seem to be producing smoke and pollution, when in fact it's just droplets of water.
Waltari 2024 年 1 月 8 日 上午 4:43 
Oh maybe its my fault, i connect it to mod 2807104839 and its rafinery, maybe this is a problem i think i can use it like all cooling towers. So sorry.
gonzaldd  [作者] 2024 年 1 月 7 日 上午 11:01 
Hello, I have done tests with several plants and it works well, I understand that you connect it to a nuclear plant, and that it is double, you connect the two outputs, right?
Also keep in mind that the nuclear power plant must be completely built, if it is unfinished you will receive a message until it is finished.
Waltari 2024 年 1 月 7 日 上午 8:14 
nop but if i use it on another factory its till with that text ;-)
gonzaldd  [作者] 2024 年 1 月 6 日 下午 2:27 
I did a quick test and it works fine for me, maybe there was a pipe connected wrong?.
Waltari 2024 年 1 月 6 日 上午 9:16 
Cooling tower still have warn sign "its not connected" so maybe need some fix ;-)
gonzaldd  [作者] 2023 年 10 月 12 日 下午 12:39 
Added factory connections, let me know if there is any problem.