安装 Steam
登录
|
语言
繁體中文(繁体中文)
日本語(日语)
한국어(韩语)
ไทย(泰语)
български(保加利亚语)
Čeština(捷克语)
Dansk(丹麦语)
Deutsch(德语)
English(英语)
Español-España(西班牙语 - 西班牙)
Español - Latinoamérica(西班牙语 - 拉丁美洲)
Ελληνικά(希腊语)
Français(法语)
Italiano(意大利语)
Bahasa Indonesia(印度尼西亚语)
Magyar(匈牙利语)
Nederlands(荷兰语)
Norsk(挪威语)
Polski(波兰语)
Português(葡萄牙语 - 葡萄牙)
Português-Brasil(葡萄牙语 - 巴西)
Română(罗马尼亚语)
Русский(俄语)
Suomi(芬兰语)
Svenska(瑞典语)
Türkçe(土耳其语)
Tiếng Việt(越南语)
Українська(乌克兰语)
报告翻译问题









I just replayed the level download straight from the Workshop and was able to 100% it. To make it on time, Atrk171 needs to head up on the northern mainline through Back Bay platform 3 to Forest Hills, where it drops down to the middle track (crossing through Forest Hills platform 2) out to Route 128. It arrives at 8:05:30 on the dot, technically 30 seconds late but far from being penalized.
Currently for Route 128 (1):
Atrk171 @ 8:05 to 8:07
P804 @ 8:08 to 8:10
Seems like should be the other way around, then P804 not having wait around so long and provides a bit of time margin for Atrk171.
I tried this map and went through half of the timetable; It's super awesome, the timetable is well made and I love the layout.
There is one train however which I had troubles around, it's Atrk171, I don't know if that was intended but this guy had only one locomotive, and returning it at Boston South I didn't realise this until it was in the middle of a line run, so I had to reverse it and make it go via the loop on the Newmarket line. But other than that, I really had fun and find the timetabling very accurate and satisfying to watch coming along. Kudos!