Workers & Resources: Soviet Republic

Workers & Resources: Soviet Republic

122 valoraciones
Station building 16/H
2
4
2
   
Premiar
Favoritos
Favorito
Quitar
Building
Buildings (by category): Passenger station
Tamaño
Publicado el
Actualizado el
16.937 MB
2 JUL 2023 a las 10:58
12 AGO a las 2:28
3 notas sobre cambios ( ver )

Suscríbete para descargar
Station building 16/H

En 1 colección creada por Shotkey
Buildings for early start
23 artículos
Descripción
This item contains one small station building representing the project 16/H («H» - Hochbau, building structure).
The following objects are available:
- station with one track 60 m (1000 passengers)
- station with two tracks 80 m (1000 passengers)
- station building for modular stations (town hall)
- bus station (500 passengers)
Using the link below, you can install 7 skins for this objects (2 skinpacks):


Geography
Czech Republic, Austria, Ukraine, Italy, Slovenia, Poland, Romania
Period
approx. 1891–1920
Destination
railway station
Architect
n/d
Project
reusable
Pieces built
about 100
Basement
stone
Wall material
brick

Historical background
The project began to appear on local lines in the Doliton part of the former Austria-Hungary in the early 1890s. Before the outbreak of the First World War, at least 90 buildings were built, which lie on the territory of several successor states of the Danube Monarchy. The project was first implemented in Volhynia (Strakonice-Vimperk suburban railway) and in Prachatice at the Vodniany-Prachatice suburban railway. According to reports, the first known buildings appeared already in 1891 on the territory of Austria. Unlike other local types, the building is not located on any main lines, unless, of course, some branches from which local lines originated are taken into account. Due to the fact that the known buildings are located in several successor states of the former Austro-Hungarian monarchy and the availability of archival materials is rather difficult, it is difficult to list all the buildings of this project. Also known as type 17H in the Czech Republic.

Layout
The layout of the ground floor is visible from the drawing: on the left there were two offices, the front part of which was also a ticket office for passengers. There were also two waiting rooms, an entrance area and stairs to the basement and upper floor. On the second floor there were two apartments for employees, one with a kitchen and a room, the other with a kitchen and two rooms. On the third floor there was one apartment with a room and a kitchen overlooking the station, two rooms in the side wings and a mezzanine on the front facade. There are modifications without a porch, as well as with one-sided and two-sided extensions, especially for the porch, which were mainly added later. As a rule, buildings differ from each other both in planning and in exterior decoration - especially now, after numerous reconstructions. In the basic project, the plaster of the building, including the corner fittings, is ocher, the windows and doors are brown. The wooden structure of the veranda is painted green on the outside and light ocher on the inside. The remaining wooden parts of the building are brown. The roof covering depended on the location of the building, in which area - either slate or beaver, the roof of the porch was tin or cardboard. Chimneys are not plastered. The floor plan does not show the corner ledges, which appear to have been only done with a thicker layer of plaster rather than masonry. The plaster of the first floor is divided by horizontal blind joints. There are other decor options - for example, in Poshtorna, the entire building was lined with ceramic tiles.

Development
Model, textures, code, debugging – Shotkey
This item was sponsored by the comrade felipe-cz.
[boosty.to]
21 comentarios
thorstein92 24 NOV a las 9:31 
Got a bug here - train tracks didn't render properly on 1-track variant. Then train teleported away to random station 11km away.
felipe-cz 13 AGO a las 0:35 
👌👏 thank you
Shotkey  [autor] 12 AGO a las 2:32 
@IndigoSolution // True. Fixed.
No panels. More bricks and boards.
This update also affect following items:
2884121784 (LVI/H station)
2905148148 (Hydroelectric plant)
2966032720 (train factory)
2977845064 (station Pushkino)
3052437725 (watertower)
IndigoSolution 9 AGO a las 5:53 
Looks like with the latest patch and using Early Start, these buildings are now locked behind prefab panels. I assume this is not intended since the building material is brick.
felipe-cz 18 DIC 2024 a las 23:29 
Tesmio 18 DIC 2024 a las 5:32 
оно бы кстати шикарно зашло в качестве магазина или бара.
felipe-cz 4 DIC 2023 a las 11:14 
@GorilaSK
Je to záměrně nastavené, tak vysoký počet cestujících…
…všechny stanice s kolekce “station building” budou mět tento počet…
GorilaSK 3 DIC 2023 a las 0:43 
Veľmi pekná budova, ale s tým počtom pasažierov si to trocha prestrelil vzhľadom na to ako je nastavená hra. Podľa proporcií, by to malo byť tak okolo 300 pasažierov pre autobus a 400 pre vlak.
RusGameTactics 4 JUL 2023 a las 10:31 
Спасибо Товарищ!!!
ждем новых интересных работ!
=)
Borjär Johnson 4 JUL 2023 a las 3:55 
Every east german train station be like. Nice Model :)