NIMBY Rails

NIMBY Rails

Bombardier Swiftstar 250 / 400
7 kommentarer
Nut 11. apr. 2022 kl. 3:25 
+MissCatTrap Thanks for that, much appreciated
MissCatTrap  [ophavsmand] 2. apr. 2022 kl. 4:43 
+Nut added in 1.2.1 by making the trains much more configurable (these numbers do not include the cabs)
Swiftstar 250: 1/2 sets, 0-10coaches per set (40-240m with cabs)
Swiftstar 400: 1/2 sets, 0-8coaches per set (50-250m with cabs)
Nut 1. apr. 2022 kl. 21:26 
Not sure if you take suggestions, but would you be able to add an 8-car (8) formation of this train and a 16 car (8+8) formation so as to match the actual proposed rolling stock specifications for HS2 trains? Lovely units by the way.
MissCatTrap  [ophavsmand] 27. feb. 2022 kl. 2:34 
Yes it’s intentional. I took a page out of the Class 395.
Trifonius 27. feb. 2022 kl. 1:27 
Great work! but is it intentional that the coaches are powered while the head/tail pieces are not? Seem slightly illogical as those hold the pantographs.
MissCatTrap  [ophavsmand] 25. feb. 2022 kl. 13:42 
+MonkeyHarris Some looco hauled stock is possibly on the way
MonkeyHarris 25. feb. 2022 kl. 12:50 
can we get a loco haul trains and you make really nice trains trains like 90 91 92 88 87 68 67 packs