Company of Heroes 3

Company of Heroes 3

(8) Stella Rota
1–9/9 bejegyzés mutatása
Frissítés: nov. 16. @ 0:48
GBPirate által

Many changes since the last update, but still WIP.

One side has had major work on the exterior of the city walls.
- pulled in the exterior redoubt roughly in-line with the interactivity layer
- added light and heavy cover, foliage, and significant texture/tile work
- one corner redoubt adjusted with stairs rather than a sharp corner.
Stone walls added to the fortress exterior to better resemble Neuf-Brisach
- still work in progress, figuring out some angles.

Frissítés: szept. 23. @ 3:18
GBPirate által

Updated atmospheres to a new kind, this time derivative of ones used on Elst Outskirts.
- 10.5 minute transition period

Pathfinding and terrain refinement along all walls (except the gate)
Tile refinements beneath buildings
Adjusted one team 2 base MG to cover the entrance properly
Slight grade added to city roads so they are not perfectly flat.

Still WIP of course.

Frissítés: szept. 16. @ 9:38
GBPirate által

Frissítés: szept. 16. @ 9:19
GBPirate által

Frissítés: szept. 16. @ 9:13
GBPirate által

Frissítés: szept. 16. @ 9:07
GBPirate által

Frissítés: szept. 15. @ 23:54
GBPirate által

Added stairs to corner elements and removed warnings about parachuting.
removed stone walkways from one wall section and replaced with a steep slope.
Some pathfinding improvements to prevent clipping into stone walls

More changes to come!

Frissítés: szept. 10. @ 10:11
GBPirate által

Frissítés: szept. 9. @ 3:30
GBPirate által