安装 Steam
登录
|
语言
繁體中文(繁体中文)
日本語(日语)
한국어(韩语)
ไทย(泰语)
български(保加利亚语)
Čeština(捷克语)
Dansk(丹麦语)
Deutsch(德语)
English(英语)
Español-España(西班牙语 - 西班牙)
Español - Latinoamérica(西班牙语 - 拉丁美洲)
Ελληνικά(希腊语)
Français(法语)
Italiano(意大利语)
Bahasa Indonesia(印度尼西亚语)
Magyar(匈牙利语)
Nederlands(荷兰语)
Norsk(挪威语)
Polski(波兰语)
Português(葡萄牙语 - 葡萄牙)
Português-Brasil(葡萄牙语 - 巴西)
Română(罗马尼亚语)
Русский(俄语)
Suomi(芬兰语)
Svenska(瑞典语)
Türkçe(土耳其语)
Tiếng Việt(越南语)
Українська(乌克兰语)
报告翻译问题









Actually, Connelly Creek wouldn't be able to keep up with that. Each log track at Connelly produces 12 logs per day, and each log car holds 3 logs. 4 * 3 = 12, so Connelly can keep up. 5 * 3 = 15, and 6 * 3 = 18, both of which are more than any track at Connelly produces daily.
Day 1: The Connolly train comes down the branch and get shoved into the unload track.
Day 2: Connolly train gets pulled and the remaining five cars that don't fit, get run around to the end of the train and stuck back in the siding, once that's done unloading it goes back up to the creek. Then the Walker train comes down on the evening freight from Bryson to be unloaded.
Day 3, Walker train gets its' remaining five cars unloaded and then it gets tacked onto the end of the freight bound for Bryson. In Bryson, a dedicated logging locomotive then takes it up to Walker Lower. Beyond that, repeat Day 1.
Day 4: Repeat Day 2.
Day 5: Repeat Day 3
Etcetera.
Haven't done anything with Pulpwood yet.
I haven't done anything with the Walker area yet, so I don't know how big those tracks are