安装 Steam
登录
|
语言
繁體中文(繁体中文)
日本語(日语)
한국어(韩语)
ไทย(泰语)
български(保加利亚语)
Čeština(捷克语)
Dansk(丹麦语)
Deutsch(德语)
English(英语)
Español-España(西班牙语 - 西班牙)
Español - Latinoamérica(西班牙语 - 拉丁美洲)
Ελληνικά(希腊语)
Français(法语)
Italiano(意大利语)
Bahasa Indonesia(印度尼西亚语)
Magyar(匈牙利语)
Nederlands(荷兰语)
Norsk(挪威语)
Polski(波兰语)
Português(葡萄牙语 - 葡萄牙)
Português-Brasil(葡萄牙语 - 巴西)
Română(罗马尼亚语)
Русский(俄语)
Suomi(芬兰语)
Svenska(瑞典语)
Türkçe(土耳其语)
Tiếng Việt(越南语)
Українська(乌克兰语)
报告翻译问题









Go into the generators and make sure they are the same priority per row.
P1 P1
P2 P2
P3 P3
P4 P4
So they dont spin randomly. Ive also got a P6 emergency diesel setup.
for the order,
2x HP turbine II-flywheel-PG II-LP turbine II-FW-PG II
explanation:
HP II makes 2MW, generates 8 steam
2 in stack 4MW
PG2 needs 3MW, 1 MW remains
LP II makes 2MW, needs 16 steam
PG II needs 3MW all used up.
the two HP II-s feed into a balancer that is priority to LP II and a side to 4 cooling towers (4 steam / tower). the towers also got balancers on them, and the LP II feeds into there as well.
Balancers are needed because auto balance doesn't run the LP II all the time, meaning it would clog up from the HP-s.
Mine runs on coal, 2x boilers on each row. Ive got four rows of this setup fed by 3 wells, and a balance setup running the water from the towers back into a buffer tank.
This plant outputs 26.6 MW